Yz Metallurgical Double Girder Overhead Crane

Yz Metallurgical Double Girder Overhead Crane

Quick introduction of YZ sequence bridge foundy crane:
YZ bridge foundry crane with hook is mainlv utilised at the olace in which the molten metal is lifted .
The operating class of the Complete device is A7,and thermal-protecting coating is additional at the
base of the major gider.The assembling and take a look at of theCrane conform to the doc
No.ZJBT[ 2007]375 which was issued by ceneral Administration of High quality Supervision ,Inspection
And Quarantine of the People’s Republic fo China.The spot in which molten nonmetal and purple-sizzling
sound metalis lifted also can refer To his document.(notice:HO in the be[ow determine is the elevated
top of buffer of the crane.HO≤250).

Usage:
Environmental problems:
one.The power of crane is a few-stage ACRated frequency is 50Hz:Rated voltage is 380V
two.The temperature of working environments is-ten~+60C
3.The requirements are more than previously mentioned-pointed out.It shall have out the demands in the
puchase contract as the person asks. Buying guidelines:The basic parameters
 (rated lifting bodyweight.Liting top and span,etc.)of the crane shall be explained cleat when the consumer orders products
Or indications a contract so that the product which might fulfill the working issue cabe supplied.

Attributes:
one.Higher functioning effiency
2.Sleek motion &comfortable operation
three.Practical upkeep & aesthetic painting
4.Mild deadweight, gentle wheel load and trustworthy overall performance
5.CZPTized:Design and manufacture in accordance to your request.

CZPT day:

Lifting Capacity T five ten
Span M 10.five 13.5 16.five 19.5 22.five 28.5 31.5 10.5 13.5 sixteen.five 19.5 22.5 25.5 28.5 31.five
Lifting Top Principal M sixteen.5 16
Speed CZPTing M/min 15.five 10.4
Crab travelling 37.2 43.eight
Trolley travelling 97.2 ninety three.seven ninety two.7 93.7 86.five
Motor CZPTing Kw 15 22
Crab travelling one.five two.2
Trolley travelling 2×5.5 2×7.five 2×5.5 2×7.5
MAX.Whee Loading KN seventy six 85 93 ninety eight 108 128 139 one hundred forty four 112 121 131 139 147 161 168 185
Energy Provide three-Section A.C.50Hz 380V three-Phase A.C.50Hz 380V

1.CZPT elements are packed by large quality plywood crate, to decrease distortion in conveying.
two. Primary beams, stop beams and trolly/winch are packed by plastic woven fabric.
It can lessen abrasion throughout the transportation.
3. If the size are suited for container ship, usually by container.
4. Big measurement, generally by bulk ship or by container following truncation.
5. Transport methods are dependent on minimizing expense & maintain safet

CZPT is l established in 1989, is the predecessor of HangCZPT CZPT crane manufacturing unit, restructuring in 2005.
Above the many years the business continued to introduce domestic and overseas advanced production technological innovation,
take up the specialized, higher-high quality professionals, the business sturdy technological pressure, superior method
products, has a professional engineering and technical personnel, initial-class set up team, outstanding
right after sale provider, and took the direct via the CZPT global high quality method certification, with
unbiased intellectual property legal rights and industrial home rights.With ten sequence over sixty types and
various non-standard lifting gear generation capability, solution promoting far more than thirty domestic provinces
and towns and more than 50 nations around the world and areas.

Certification:

Our Support:
Pre-Revenue Service
*Inquiry and consulting support. 

* Sample testing assist. 

* See our Manufacturing unit

Soon after-Product sales Provider
*Coaching how to instal the equipment

*Education how to use the equipment. 

*Engineers CZPT to support equipment abroad

FAQ:
Q:Are you manufacturing facility?
A:Of course, we are manufacturing facility with 31 several years previous.
Q:How long is your warranty?
Our warranty is 24 months soon after acquired the items.
three.The usage period of time.
About 30 a long time below frequent use.
4.How can we set up the crane?
Our senior engineer can be your side to do the set up guide provider and training.
If you want our goods, you should make contact with with us ASAP!We will do our ideal for you!
 

Yz Metallurgical Double Girder Overhead Crane

Tags: