S sequence CZPTcal Geared Motor Qualities
1. Functions:
- High performance: 75%-80%
- Large technologies: the helical gear and a worm equipment combined with an integrated transmission to improve the torque and effectiveness.
- Higher precision: the gear is made of high-quality alloy steel forging, carbonitriding and hardening treatment, grinding method to guarantee higher precision and steady operating.
- Substantial interchangeability: extremely modular, serial style, sturdy versatility and interchangeability.
2. CZPT parameters
Ratio | 6.8-288 |
Enter electricity | .12-22KW |
Output torque | 11-4530N.m |
Output pace | 5-206rpm |
Mounting type | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Technique | Flange enter(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor |
Brake Release | HF-handbook release(lock in the brake launch position), HR-guide launch(autom-atic braking place) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Type | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing materials | HT200 higher-strength cast iron from R37,47,57,sixty seven,seventy seven,87 |
Housing material | HT250 Substantial energy solid iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment method |
Single Phase Performance | 75%-eighty% |
Lubricant | VG220 |
Security Course | IP55, F class |
About Us
ZheJiang CZPTshine Drive Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was established in 1965. CZPTshine specializes in the comprehensive energy transmission solution for higher-end equipment producing industries based on the intention of “Platform Solution, Software Layout and Specialist Services”.
CZPTshine have a strong technological force with in excess of 350 workers at present, like more than thirty engineering technicians, 30 quality inspectors, masking an area of 80000 square meters and kinds of innovative processing equipment and tests equipments. We have a excellent foundation for the business software growth and support of substantial-end velocity reducers & variators owning to the provincial engineering technology research center,the lab of equipment velocity reducers, and the base of modern R&D.
Our Team
Quality Handle
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping