Short Introduction:
6LN-a hundred and twenty combined rice milling device is a little family paddy husking mechanical solution which is primarily based on big scale milling equipment function theory to layout. It can be out of unhusked rice shell, make brown rice and polished rice. It have the feature of compact construction, stunning appearance, save time and vitality conservation, basic procedure and so on. It is implement to the region and area which have paddy. The edge of this device is easy framework, handy utilization, secure and trustworthy and so on.
Primary Functions:
1. This equipment is a small loved ones paddy husking mechanical merchandise which is based mostly on huge scale milling machine work theory to design.
2. Compact framework, beautiful appearance, preserve time and power conservation, easy operation and so on. It is utilize to the region and spot which have paddy.
three. This machine has basic composition, practical usage, protected and reliable and so on. In contrast with the big scale milling machine, it have the reduced value, basic procedure attribute, it is in shape for family members use.
Main CZPT Parameters:
Power tools | 2.2KW |
Rotate pace | 2800r/min |
Whole bodyweight | 120kg(Including electrical power) |
Dimensions(mm) | 690 X 440 X 1120 |
Electricity intake | ≤22(kw.h/t) |
Dust focus | ≤10(mg/m3) |
Productiveness(kg/h) | ≥120 |
Package | seventy six*forty eight*100cm |
Solution specifics:
Factory Photographs:
Pre-Revenue Support:
one. Inquiry and consulting support
two. Sample screening assist
three. Look at our Manufacturing facility
After-Income Provider:
one.pay the double air tickets, accommodation and food. Our technicists can support you in nearby location
two.According to the requirement of the buyer, our company sends engineers for installation and commissioning in buyer’s site including the training of skills of buyer’s workers on operation, maintenance, etc.
3.Supply the options for diverse farming setting.
4. For the damage caused by the users, our company provides the parts and accessories with cost price.
5. Our factory supplies the wearing parts with the cost price to clients.
Bundle&Delivery:
Items will be finished in 15-twenty working times after payment. It relies upon on your buy amount. And the shipping and delivery time to the port is about one-2 days