High Speed Cable Cantilever Single Twisting Bunching Machine

High Speed Cable Cantilever Single Twisting Bunching Machine

                       High Velocity Cantilever Exported Cable Bunching Machine

Video url on Youtube:
EPresults?search_question=hoohahk.com

The specifications of the bow variety bunching machine 
 

Machine kind CZPT -φ1250D
Wire solution of stand Particular use twist aluminum and copper round push dowm the conductor
Cooper wire specific Φ1.5-4.8
End standed wire/max. ten mm φ/max
Finish standed wire/Max. 15mm φ/max
Part of strand-twisting(Flexible strand) three.5÷70mm2(6AWG÷450MCM)
Section of strand-twisting(Semi-frametwisting1+six) three.5÷50mm2(6÷1/0AWG)
Part of compaction Cu 3.5÷50mm2(6AWG÷300MCM)
Segment of compaction Al 3.5÷70mm2(6AWG÷301MCM)
Line speed/Max. 150mpm/max
Stand pitch(mm) forty-350mm
60 8000rpm/max.(1600TPM)
Load weight/Max. 3000KG
Max.compaction angle 13%
Traction pulley 2×φ600mm
Standing Course S,Z Route
Major motor(DC/AC/HP) 55kw D.C. motor
Push of Capstan(DC/AC/HP) 30kw D.C. motor
Travel of just take-up device(DC/AC/HP) seven.5kw D.C. motor
Push of traverser .75kw Inverter motor
Push of liading&unloading 1.5kw Inverter motor
Energy management Digital sort DC management
Revise method Line pace synchronous car manage
Spool bobbin dimensions OD OD:φ1250 mm/Max
Spooler size OW 950×800×80(mm)
Manage method PLC man-machine interface
Rigidity manage Coiling motor signifies pressure management
Lay stranding pitch PLC digitization setting
Working path Left/ appropriate hand machine
Traversing width 1000mm/Max
Traversing device Wire diameter setting by digital type
Get-up variety Reel taken amongst pneumatic pintles
Reel loading & unloading Liquefaction computerized positioning
Brake program Disc brake
CZPT lubricative variety Oiling often
Air strain 6kg/cm2
Vogtage 380V 50Hz
Sound degree 80db
Device dimensions (L)6030×(W)2280×(H)2280mm
Excess weight 12500kg

 

Skilled and Strong Manufacture and Revenue Crew

 

Team of CZPT support
Identify education and learning Place Primarily responsible for project Specializing in project  Sector working history    
( year )
zHangCZPT Xie college CZPT Engineer The whole venture style and plHangCZPT  electricity cable device 15
xioahua Hu university Vis basic engineer The complete project style and plHangCZPT  web cable,info cable device ten
Chnaghong Cheng school Engineer Drawings and soon after-product sales services Teflon,Optical fiber cable equipment twenty five
xiuwu Chen school CZPT Engineer The total undertaking layout and plHangCZPT  copper drawing equipment fifteen
lixin Yuan school Engineer The project style and plHangCZPT  coppwer wire generating specialized sixteen
zhenghai Qiu college cable engineer Soon after provider cable generating and cable manufacturing unit management servie 15
jinxin Liu higher education Marketing and advertising engineer Soon after service electrical engineer 7
xingguo Tang High college CZPTal engineer Soon after provider electrical engineer 10
changqiang Li High university Preserve engineer Soon after provider machina maintain and put in service 10
haipin Li College CZPT director  Marketing and advertising and income undertaking consulting  eight
sen Yang College CZPT translator Marketing and income task consulting  five

CZPT Areas Makes

Motor: HangCZPT Motor , Teco, ABB, Siemens
Inverter : Japan Yaskawa, Siemens, ZheJiang Teco
Temperature Manage Meter: Japan RKC
Auxiliary Relay: Japan Omron
Ammeter and Voltmeter: ZheJiang Risesun
Indicator, Swap and Button: ZheJiang Are inclined
Contactor: ZheJiang Shihlin
Line Pace Meter: ZheJiang FOTEK/Xihu (West Lake) Dis.
CZPT : NSK, SKF

Soon after provider

1).Delivery dates: 45 times
2).Payment: TT or L/C
three).Packing: Wooden packing and PE plastic packing ensure the goods protection on the transportation.
4). Set up and coaching support: 2 professional engineers who has in excess of 5 years abroad install and cable manufacture education encounter.
5) following provider mobile phone variety on the internet

Get in touch with us

  
Our Web site:
Include: No. 38, Houhu Highway, Humen City, HangCZPT CZPT, ZheJiang Province, China

Location

Hongkong airport to Humen by boat 2 hours
HangCZPT airport to Humen by vehicle 2 hours
HangCZPT airport to Humen by auto 1 hour
HangCZPT South substantial pace prepare station to Humen twenty minutes
HangCZPT North large velocity train station to Humen 20 minutes

 

Exactly where are we

Hongkong airport to Humen by boat 2 hours
HangCZPT airport to Humen by auto 2 hours
HangCZPT airport to Humen by vehicle 1 hour
HangCZPT South higher velocity teach station to Humen twenty minutes
HangCZPT North higher velocity prepare station to Humen 20 minutes

Matter: 1250 CZPT Twist Buncher
But equipment need to be created to previous up to five,000Kgs.
A. Offer scope and Specification:
one. Line composed of:
one ) 800 (630) mm pay out-off: 800 (630) mm x 10 CZPT motorized spend-off
2) Collective base
three) CZPTal Handle Box
four) 1250 mm CZPT Twist Equipment Principal physique
two. Specification of Principal entire body:
1) Final application:
Bunching of Bare copper wire, Stranding of Insulated cable
two) Inlet dimensions:
– Bare Cu. Wire .5 – 1 .5 mm dia.
– Insulated core cable one. – 8. mm dia.
three) Finished dimension following bunching & Stranding:
– Bare Cu. Wire 7. mm dia.
– Insulated main cable 20. mm dia.
But this machine need to generate bare copper wire stranded as concluded product
up to 35 mm sq.
four-1 ) Lay pitch: 30 – 250 mm, Pitch selection: 50 mm to 250 mm at every 10 mm interval
EHI will give the provider with information sheet for all pitches
4-2) Pitch altering system: by Electronic pitch altering program
five) Traversing:
forty mm Rolling rod (German) + traversing unit (Tian Xiang) but inside of CZPT equipped
with NSK CZPTs
6) Line pace:
Max. seven hundred rpm, Speed controlled by Inverter
seven) Standing & Bunching Route:
S or Z direction, Path by manual swap
8) Bobbin Carry Up and Down: By Oil (CZPT) lifter with 5 HP AC motor
9) Just take-up bobbin: 1250 mm. As per the attached drawing
Max. bodyweight of get-up bobbin (entirely wound): 4,000Kgs

1 ) Motor:
Principal human body: fifty HP AC Motor (TECO) + 50 HP Inverter(YASKAWA)
one 1 ) Duration counter: ZheJiang TOFEK PM12-04N Sensor, 5 digit, Precision +/- .3%
twelve) Supply Power: 380 Volt., 60Hz, 3 Phase
thirteen) Emergency cease for protection:
When doorway opened. When CZPTr is not located in the appropriate positions
1 four) Automated cease:
Cable damaged, Cable achieved to preset length
one 5) Detecting unit for Damaged end: to be mounted
Its area: 1 inside + 1 outside the house
16) Principal management panel:
Mitsubishi Touch display screen & Mitsubishi PLC
1 7) HDI: Electronic show for Rotational pace, Line pace, Duration counter, Doing work hrs,
Alarm failure indicator
18) Metal plate for Major body
eighteen-1) St. plate Quality: to be specified
18-2) St. plate Thickness:
– Thickness of Base metal plate base: mm T.
– Thickness of Wall aspect: mm T.
The supplier ensure unacceptably serious Vibration (this significant vibration will result
immediately existence-time of machine right after long-expression use) will not happen.
19) Primary CZPT & Cooling system for primary bearing:
19-1) CZPT model: NSK
19-2) Cooling system: Car. Grease Feeding Program (whole 2 sets)
20) Cooling technique within DTB: Substantial velocity 4 Fans
20-1) Ability of Admirer motor: 1 HP/enthusiast
twenty-2) Air OUT from DTB: 4 Positions at Leading side by 1 HP at every single position
twenty-three) Air IN to DTB: 2 Positions at Back again-wall side but no followers
21) Stress management: twenty Kg Powder Clutch (ZheJiang )
22) Unexpected emergency Brake:
22-1) Inside by Electromagnetic brake (Brand name title and its specification to be specified)
22-2) Outdoors by Disk sort brake (ZheJiang manufacturer, its specification to be specified)
23) CZPT Bow: Carbon fiber bow variety
24) Heat-remedy:

Warmth-treatment method ought to be accomplished for all metal shifting parts & components
twenty five) CZPTs to be utilized at other areas: NSK and NACHI
26) Dimension: mm L. x mm W. x mm H.
27) Pressure ON/OFF: to be geared up
28) Dimensions of Capstan inside of primary human body: mm dia.
The supplier guarantee no harm to cable good quality (insulated concluded cable 35 mm sq.)
by bending seriously even on the a.m. capstan dimensions
29) Sound stage: Under eighty five dB
30) Lubricating technique for within Primary shaft: to be positioned Exterior but guide grease feeding

 

High Speed Cable Cantilever Single Twisting Bunching Machine

Tags: