Flange Mounted Helical Inline Geared Motor

Flange Mounted Helical Inline Geared Motor

R series CZPTcal Geared Motor Traits

one. Features:

one. High effectiveness: ninety two%-97%

 

two. Compact structure: Little offset output, two stage and three stage are in the very same box.

 

3. High precision: the equipment is made of higher-top quality alloy metal forging, carbonitriding and hardening treatment method, grinding method to make sure high precision and steady managing.

4. High interchangeability: highly modular, serial layout, sturdy versatility and interchangeability.

2. CZPT parameters

Ratio 3.41-289.74
Enter energy .twelve-160KW
Output torque 61-23200N.m
Output speed 5-415rpm
Mounting type Foot mounted, flange mounted, foot and flange mounted, solitary-stage foot mounted, one phase flange mounted, Flange-mounted with prolonged bearing hub
Input Technique Flange input(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor
Brake Release HF-guide release(lock in the brake launch position), HR-manual launch(autom-atic braking position)
Thermistor TF(Thermistor protection PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Kind R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing substance HT200 higher-energy solid iron from R37,forty seven,57,sixty seven,seventy seven,87
Housing substance HT250 High power solid iron from R97 107,137,147,157,167,187
Heat treatment technology carbonitriding and hardening remedy
Efficiency ninety two%-97%
Lubricant VG220
Defense Class IP55, F class

CZPTshine Travel

ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a condition-owned military mould enterprise, was proven in 1965. CZPTshine specializes in the total energy transmission solution for substantial-conclude products producing industries based on the aim of “System Item, Application Layout and Expert Services”.
CZPTshine have a strong technological force with over 350 workers at existing, including above thirty engineering specialists, 30 top quality inspectors, covering an spot of 80000 sq. meters and varieties of sophisticated processing machines and testing equipments. We have a good basis for the sector application improvement and support of large-end pace reducers & variators owning to the provincial engineering technology analysis center,the lab of equipment pace reducers, and the foundation of modern day R&D.

Our Crew

Quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Delivery

 

Flange Mounted Helical Inline Geared Motor

Tags: