Element I&colon Solution INTRODUCTION
1&interval Description&colon Seamless rectanglar metal tubes&comma with the other name rectangular hollow segment&comma is made from very hot rolled seamless steel pipes&interval It is not welded hollow part&time period It is made through hydraulic cold drawing and is seamless tube with tight size tolerance&comma ideal twist&commaetc&period
two&period of time Commodity&colon ASTM A519 cold drawn seamless rectangular steel tubing
three&period of time Obtainable metal gardes&colon
ASTM A519&colon | SAE1571&commaSAE1026&commaSAE1045&commaSAE1518&commaSAE1524&commaSAE1541&comma SAE4130&commaSAE4140&commaSAE4145&commaSAE4340&commaSAE8620 |
DIN 2391-2&colon | ST35&commaST45&commaST52 |
EN 10305-one&colon | E195&commaE235&commaE355&commaC35E&commaC45E&comma25CrMo4&comma34CrMo4&comma42CrMo4&comma |
EN 10305-four&colon | E215&commaE235&commaE355 |
GB&solT 3639&colon | 10&num&comma20&num&comma45&num&comma16Mn&commaQ345B&commaQ345C&commaQ345D&commaQ345E&comma25Mn&comma27SiMn&comma |
5&time period Measurement range&colon
Facet | 80mm&ast60mm-300mm&ast200mm |
W&periodT&colon | 35mm max |
six&interval Manufacture technique&colon CZPT cold drawn
seven&time period Shipping Problem&colon
BKW | BKS | GBK | NBK |
&plusLC | &plusSR | &plusA | &plusN |
Cold drawn | Stress relieved | Annealed | Normalized |
8&period End end&colon plain ends with square cuts&commabevelled finishes&period
nine&interval CZPT export packing&colon in bundles tied with metal strips&period Internal and external oil coating&period of time External packing by PVC baggage and knit luggage&time period
ten&interval CZPTized packing or marking are CZPT upon request&period of time
Cold DRAWN SEAMLESS RECTANGULAR TUBE – NOT Warmth Taken care of&colon
Cold DRAWN SEAMLESS RECTANGULAR TUBE – Tension RELIEVED&colon
Cold DRAWN RECTANGULAR TUBE – Heat Dealt with&colon
Portion II&colon Frequently Requested Questions
1&period of time MOQ&colon five tons&solsize based on the dimensions&period
2&period of time Supply Time&colon thirty-forty five times regular&period
three&period Guarantee&Assure&colon Guarantee&promise period is 6 months since we deliver the tubes&comma and we are not responsible for high quality problem triggered by incorrect unloading or storage following shipment&interval We welcome customer’s inspection prior to shipment&period
four&interval Payment Strategy&colon We settle for payment strategy like T&solT&comma L&solC&comma or D&solP&comma but it relies upon on our investigation about customers&period of time We have a solution to evaluate the credit score of clients from all over the entire world&comma and time and sum of D&solP we can release is decided by the analysis&period
5&period Quality Management&colon We purchase uncooked materials from secure suppliers who are foremost metal mills&comma and we inspect the raw material as for every the technical specs&interval In the course of our generation method&comma there is inspection and good quality control in every stage&time period
Portion III&colon Business INTRODUCTION
We are a manufacturer of chilly drawn&comma chilly rolled&comma and hydraulic chilly drawn metal tubes with OD upto 356mm given that 2002&period Covering an spot of about 32000M2&comma we have twelve common workshops with 2 hydraulic cold drawing benches&comma four chain chilly drawing benches&comma and two ERW mills&interval Our facilities addresses all the manufacturing techniques from pickling&comma cold drawing&commaheat treating&commasaw slicing&comma straightening&commainspection&commapacking to even more machining &turning&comma cold drawing die fabrication&comma and products repairation&upkeep&period of time
Factory Appearance&colon
Raw Material Inventory&colon
HYDRAULIC Cold DRAWING&colon
STRAIGHTENING&colon
Saw Cutting&colon
Warmth Dealing with FURNACE&colon