250W six Pole Centrifugal AC Fan Motor for Warmth Pump (CE, CCC)
Item DESCRIPTION
Design | Power(W) | Voltage(V)/HZ | Amps(A) | Pace(Pole) | No. of Speed |
YDK-a hundred twenty five-six | 125 | 220V 50HZ | 0.6 | 6 | one~three |
YDK-a hundred and fifty-six | 150 | 220V 50HZ | 0.7 | 6 | 1~3 |
YDK-a hundred and eighty-six | 180 | 220V 50HZ | 0.eighty two | 6 | one~three |
YDK-245-six | 245 | 220V 50HZ | 0.ninety three | 6 | one~3 |
YDK-375-six | 375 | 220V 50HZ | 1.two | 6 | one~3 |
YDK-550-6 | 550 | 220V 50HZ | 1.nine | 6 | one~3 |
YDK-750-six | 750 | 220V 50HZ | 2.4 | 6 | 1~3 |
Solution Feature
one.Compact construction, small size, mild weight, stunning physical appearance.
2.Constant increase minimal, large efficiency, environmental security, vitality saving, smooth managing, low sounds
three. Unique bearings for minimal sound, easy working, small vibration, and aluminum alloy end caps for corrosion resistant.
4. Created-in temperature control swap to properly shield the motor, substantial trustworthiness for prolonged services life.
five. Multi-pace regulator, a assortment of set up approaches to meet up with different requirements.
Items Present
Notes:
The above mentioned specification is representative specification,The specification can also be made and manufactured according to buyers necessity.
The items of 100-120V,200-240V,60Hz can also be supplied as asked for.
We will not give particular notice on changes,please get in touch with our technical department for even more information.
Trade Conditions:
1. Trade Terms: FOB, CIF, CNF, EXW, Doorway TO Doorway.
two. Payment Terms: T/T, L/C, Western Union.
3. Payment Problem: thirty% deposit in advance, 70% balance before shipping and delivery.
4. Supply Time: 15-30 times right after deposit (if T/T).
5. Transport: By sea, by air and by convey delivery
Our competitive Rewards:
one) Cost and excellent support
We have twelve many years expertise in the generation and management of AC admirer motors and enthusiasts, have our own plant, management fees and procurement fees of rigid handle, and peer fairly strong cost edge. So we can provide high top quality items and providers.
2) CZPT edge
Our Primary individual who is in cost of technologies, has twenty several years of motor, admirer motor manufacturing knowledge, with a number of CNC lathe, automated punching device, automated winding machine, computerized oiling equipment, wind blade balancing instrument products motor primary manufacturing procedures are for the factory generation.
three) Product gain
Large effectiveness, energy preserving, large starting up torque, minimal sounds, minor vibration, trustworthy operation and straightforward maintenance and so on. We have expense gain, technological gain and considerable expertise. So you can get the same value obtain a lot more much better products, or devote considerably less for the exact same solution.
4). Our motor is mostly employed in HVAC industry, this kind of as air conditioner, air cooler, fan coil device, purifier, water heater, induction fan, duct admirer, dehumidifier, evaporator, condenser, and so on. Motor output power from 5W-750W.
five).Our ac fan motors have two sorts, one section asynchronous admirer motor and three phases asynchronous fan motor. It is practical in set up with high efficiency.
FAQ:
Q1- How to get the exact supply?
The specific value will be quoted following examining the specification and mounting dimension of the motor.
Q2- What is the warranty of the motors?
The warranty is 12 months on the production date, beneath the warranty we will afford the transport cost to send the substitution.
Q3- What is the software of the motors?
All our motors are widely employed in HVAC method.
This autumn- Can you layout the motor according to the different request?
Of course, we can offer you the ODM/OEM.
Q5: Are you a maker?
A: Indeed, We have been in developing and providing excellent products for consumers. Our manufacturing facility generation is all comply to ISO 9001 Top quality Administration System.
Q6: How extended you could put together samples?
A: Normally three days if we have the sample in hand. If CZPT 1, about a 7 days about.